Thursday, October 15, 2015

Renovations

Kurt says:

With Alison moving to the boat in a month I have to finish a whole lot of projects I started. I just finished pulling all the LP gas appliances from the galley and replacing them with electric alternatives. Gas scares me. My LP system has a leak in it somewhere so I have never used it. With Alison coming aboard it would be nice to be able to cook things other than pasta and soup. Food is love, so says Alison. I added a second 30 amp input and a new distribution panel with three circuits -- one for the convection oven, one for the microwave and another for an outlet. We will use a portable induction stovetop for our boiling and frying needs.
Before

Next on the list is repairing some of the leaks that I have lived with for the past four years. Condensation will be a major problem in the winter and I would like to limit the amount of moisture in teh boat as best I can. After that I will continue to remove the nasty old carpet that lines the hull and replace it with cedar slats. There are a couple of shelves to add and maybe a cabinet or two for good measure ... and extra storage.

I also have to finish replacing the oil pump on the engine so I can get rid of all the engine parts that are scattered about. Once the engine is running our alternative power source will be complete.

Almost Done. Just some trim work.

No comments:

Post a Comment